• When you synchronize your Sage Construction Project Center site with Sage 300 Construction and Real Estate, your standard cost codes and categories are uploaded. This job reference explains how standard cost codes and categories, projects, and job cost codes and categories are used by the system. (For step-by-step instructions to configure synchronization, see the Sage Construction Project Center and Sage Bid Management Setup Guide.)

 

Synchronize at the organizational level

 

  • During initial install of the Sage 100 Contractor and configure synchronization with Sage 300 Construction and Real Estate, standard cost codes and categories are uploaded to the cloud automatically
  • Go to Setup and click Advanced List Management

Setup 
List Management 
Advanced List Management 
Bidder Categories 
Org Project Options 
User Groups 
Integrations Setup 
Performance Evaluation Setup 
Org Bid Package Template 
Org Bid Package Message Template

  • Select the Cost Codes list. This list matches the Standard Cost Codes you have set up in the system, including the standard categories assigned to each. Notice that the list is defined at the Organizational Level.

Edit Cost Codes 
Advanced List 
List defined at the Organization level 
Code Division Description 
01 
02 
03 
04 
05 
06 
07 
08 
09 
10 
11 
12 
13 
14 
15 
16 
17 
21 
22 
23 
25 
26 
27 
28 
31 
32 
33 
34 
40 
90 
99 
GENERAL REQUIREMENTS 
EXISTING CONDITIONS 
CONCRETE 
MASONRY 
METALS 
WOOD, PLASTICS, & COMPOSI 
THERMAL & MOISTURE PROTEC 
OPENINGS 
FINISHES 
SPECIALTIES 
EQUIPMENT 
FURNISHINGS 
SPECIAL CONSTRUCTION 
CONVEYING EQUIPMENT 
MECHANICAL 
ELECTRICAL 
MINORITY SUBCONTRACTOR 
FIRE SUPPRESSION 
PLUMBING 
HVAC 
INTEGRATED AUTOMATION 
ELECTRICAL 
COMMUNICATIONS 
ELECTRONIC SAFETY & SECUR 
EARTHWORK 
EXTERIOR IMPROVEMENTS 
UTILITIES 
TRANSPORATION 
EQUIPMENT 
SMALL JOBS 
TAXES AND INSURANCE 
Sort 
1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
11 
12 
13 
14 
15 
16 
17 
18 
19 
20 
21 
22 
23 
24 
25 
26 
27 
28 
29 
30 
31 
This list is controlled by an outside source and may not be modified here

  • Select the Cost Code Categories list.  This list matches the standard categories set up in the system, and is also defined at the Organizational Level.  Neither list can be edited in Sage Construction Project Center. Add any standard cost codes or categories in Job Cost (Setup > Standard Cost Codes or Standard Categories). New items will be uploaded to the cloud during the next scheduled synchronization.  

Edit Cost Code Categories 
Advanced List 
List defined at the Organization level 
o 
Code Description 
E 
L 
M 
o 
OH 
OT 
s 
G 
Equipment 
La bor 
Material 
Other 
Overhead 
Overtime 
Subcontract 
General 
Allocation 
Equipment 
La bor 
Material 
Other 
Overhead 
La bor 
Subcontract 
Overhead 
This list is controlled by an outside source and may not be modified here

 

Synchronize at the project level 

 

  • When you first configure a project to synchronize with Sage 300 Construction and Real Estate, the cost codes and categories associated with that job are uploaded to the cloud automatically.
  • Go to Project Setup and click Advanced List Management
  • Select the Cost Codes list. This list matches the Cost Codes set up for this job. Notice that not all standard cost codes have been added to the job. The list is defined at the Project Level.

  • Select the Cost Code Categories list. This list shows the list of all categories that have been set up for at least one cost code on the project. This list is also defined at the Project Level.

 

Add cost codes to a job

  • When creating a commitment in Sage Construction Project Center, line items corresponding to existing cost codes and categories on the job can be added—or cost codes and categories can be added from the standard cost code list. In this example, cost code 09-260 Gypsum Board Systems has not been set up on the job yet
  • Click Show Standard Cost Codes to select a cost code that has not yet been added to the job. (The button name changes to Show Project Cost Codes.)

  • Save the commitment lines and click Request Synchronization.  The commitment is sent to Job Cost and the new cost code is added to the job.